kW, kVA, MW and sizing

kW, kVA and MW: How to Size a Rental Generator

What the ratings mean, how to convert between them, why starting current decides the size, and the point at which a load study stops being optional.

Written by RentGeneratorsNearMe Editorial Team, Editorial team
Published October 16, 2026Updated October 30, 2026

Getting the size right is the single decision that determines whether a rental works. Undersize and the set trips or damages equipment; oversize and you pay for capacity you never use while running the engine at a load too light to be healthy for it.

What the ratings mean

  • kW (kilowatt) — real power, the work actually delivered.
  • kVA (kilovolt-ampere) — apparent power, the total the alternator has to supply.
  • MW (megawatt) — 1,000 kW, used for utility, industrial and large temporary-power projects.
  • Power factor — the ratio between them. Check the power factor stated on the actual generator rating; do not assume every set uses the same value.

To convert: kW = kVA x power factor, and kVA = kW / power factor. At 0.8, a 500 kVA set is a 400 kW set.

Prime, standby and continuous ratings

The same physical machine carries different ratings depending on duty. A standby rating assumes occasional emergency use; a prime rating assumes variable load for extended periods; a continuous rating assumes constant full load. Comparing a standby number against a prime number makes one unit look larger than it is. Ask which rating the quote uses.

Why starting current decides the size

Induction motors — pumps, compressors, lifts, HVAC, refrigeration — can draw several times their running current for the first seconds of start-up. A load list that only totals running watts will point you at a generator that cannot start the equipment it is supposed to run. Starting order matters too: staggering large motor starts can meaningfully reduce the size you need.

Building a usable load list

  1. List every load with its running watts or amps, and its voltage.
  2. Note starting requirements for anything with a motor or compressor.
  3. Mark which loads run simultaneously and which never do.
  4. Record voltage, phase and connection type for each.
  5. Ask the sizing specialist to allow for any planned additional loads.

Voltage, phase and connection

A correctly sized generator that cannot be connected is no use. Confirm single-phase or three-phase, the voltage the equipment needs, the receptacle or termination on the unit, and cable sizing for the run length. Voltage drop over a long cable run is a real derating factor.

When you need an engineered load study

Bring in an electrical engineer or the provider's application team when the job involves life-safety systems, medical or data-centre load, paralleled sets, utility-interactive operation, large motor starting, non-linear load such as variable-frequency drives, or anything permit-conditioned. A load study is not upsell; it is what stops an expensive outage on a live site.

An important limit on any rule of thumb

No kW figure can be promised to power a specific site without a load calculation. Charts and calculators — including any on this site — narrow the range and prepare you for the conversation. The provider's sizing check and, where required, a qualified electrical review, is what confirms it.

Common mistakes

Comparing a kVA rating against a kW requirement, sizing to nameplate totals rather than realistic simultaneous load, ignoring starting surge, and forgetting that a lightly loaded diesel run for weeks develops its own maintenance problems.

Questions people ask